March 2024 Visit Malawi Hiromu Okazawa

From March 1st to 16th, 2024, Hiromu Okazawa visited Malawi.
Checked the current status of the solar irrigation system installed on the plots of Sustainable Cape Maclear and dealt with any malfunctions. Installed a rain gauge, a soil moisture gauge, and a monitoring system for the soil moisture potential on the plots. Also, maintained the weather gauge and acquired images using a UAV. Had dialogues with the irrigation area and the Parmaculture farmers to analyze leverage points.